Process Editor

Process Editor

Submitted by (@spenseler)

Validity of processes / expiry of maturities

Each process should be valid only for a certain period until it is tested again. You should be able to deposit validity for each individual process and globally for all processes. If this period approaches, you should receive a message, that you need to check the process again and adapt the validity. The following aspects should be considered: - Set the time limit before the expiry and select (e.g. 1 week, 30 ...more »

Translation

Translated (Unverified) View Original

Voting

100 votes

Process Editor

Submitted by

Process link to link events should point to a model element

Currently only one diagram is linked. It would be helpful to be able to define a specific link-start event as a goal. When you open the link process it could jump directly to the correct element. (This idea has been detected on the Signavio Customer Day 2013)

Translation

Translated View Original

Process Editor

Submitted by

Acquisition of the renaming of sub-processes

Currently you can click on the "Accept Chart Name" in the linking of sub-processes. Thereby the current name of the linked diagram is used. If the Linked Chart renamed, the renaming will not be accepted. The check mark "accept Chart Name" is removed and the designation of the sub-process is not active. This means that you have to look before renaming charts, where they linked and set after renaming the check mark in the ...more »

Translation

Translated (Unverified) View Original

Process Editor

Submitted by (@patrick.hartlaub)

Staple icon in annexes in Editor

IS: I add an icon to a file as an attachment, I see in the portal the staple icon to call up the Annex.

Am I in the editor, I see the staple NOT. I see only with attributes that a file is stored.

 

TARGET: symbol to appear in the same portal as editor.

 

Thank you for considering advance.

Translation

Translated View Original

Voting

61 votes

Process Editor

Submitted by (@stephanie.schoen)

attribute visualization: Visualize measure probability at the edges in the process and in the process expression / pdf

At the moment there is only the possibility of the frequency ratios (per year) and execution time (in minutes) in the process show / visualize and to print or to be exported as PDF.

Translation

Translated View Original

Process Editor

Submitted by (@stephanie.schoen)

Place IT systems automatically below / above an activity

At the moment the IT system is automatically placed right from the activity, by using the quick selection.

It would be better if the IT system would be automatically placed below or above the activity. Since the BPMN modeling is created from left to right and the system would be covered by a new activity. Thus, it is necessary to place the IT system below or above the activity in each time.

Translation

Translated (Unverified) View Original

Voting

52 votes

Process Editor

Submitted by

Text annotation

It would be good if the text annotation could be hung from any side to an object and the text then left accordingly or would flush right. At present, the clip is always open to the right and the text left-justified. So If you move (s) the annotation on the left side, the result looks not good.

Translation

Translated (Unverified) View Original

Voting

50 votes

Process Editor

Submitted by (@reto.zumstein)

Validity period for comment invitations

Invitations for comments (feedback) have no expiry date. Thus, invited parties have unlimited access to the system. An invitation can only be withdrawn manually in the process editor. It would be desirable to have a configurable validity period for invitations. Is there a way to evaluate who is working on a Signavio workspace resp. Diagrams has access?

Translation

Translated (Unverified) View Original

Voting

44 votes